LED Construction is a professional construction, Project Management, and custom remodeling company. We have been building homes in the San Francisco Bay Area since 2008, specializing In Victorian, Edwardian, and Craftsman style houses, as well as Mid-Century architectural designs. From foundation to finish, LED Construction honors their historic architectural beauty, while bringing them into the modern age. Room additions/soft story additions have been our mainstay for the last couple of years, as clients have made the transition from working in the office, to the comfort and convenience of their homes. Soft story additions require structural and foundation strengthening, and LED has many years of experience providing full structural and foundation retrofitting. In essence LED Construction is a comprehensive turnkey construction company, project managing the building process with logistic efficiency, from conception to completion, utilizing modern managing techniques to help insure efficient workflow through the entire building process.
Pierce Street — Facade Restoration
Facade restoration with hand-built columns and trim from Beronio Lumber, with custom milled on site . LED Construction handcrafted the square columns in an on-site “mill” set up in the project’s garage, thankfully they turned out great!
The entry restoration included new crown molding from White Brothers, the same company that supplied the original moldings roughly a century earlier.
With thanks to Lorna Kollmeyer Ornamental Plaster for the beautiful plaster pieces used in this restoration.
View the complete Pierce Street project album
Before and after


Restoration in progress







Facade and finished details











White trim, plasterwork and columns












San Antonio — Project Management & Waterproofing Consultation
LED Construction provided project management, construction consultation and waterproofing consultation for this San Antonio St. mansion, in Alameda.
View the San Antonio consultation album



Berkeley — Kitchen, Bathroom & Hallway
View the complete Berkeley kitchen, bathroom and hallway album
Kitchen — before and after


Kitchen details



Bathroom — before and after


Hallway and trim


Moraga ADU, which also included a 120′ sewer lateral!
View the Moraga ADU project album









McGee
A foundation-to-finish project, including the shingle exterior, custom trim, entry railings, interior woodwork and concrete sitework.
Exterior and sitework





Entry, railings and exterior trim














Interiors and woodwork










Lakeview
which involved a rear addition, new kitchen, fleetwoow doors, and three remodeled bathrooms.
The exterior staircase features slate steps and LED light strips embedded along both sides. The slate joints align precisely from the stair treads through the upper landing to the Fleetwood doors.
View the complete Lakeview project album
Kitchen — blue tile and dark countertops


White veined bathroom and blue tile details




Patterned-tile bathroom


Shower work in progress

Deck, Fleetwood door and Ipe seating




Stucco, benches and exterior stairs





Folsom Street Full House Remodel
LED Construction gutted and remodeled the interior, installed structural beam work and sheathing, and reinforced the entire roof and foundation. The remodel added a downstairs room, renovated the two kitchens upstairs and downstairs, remodeled two bathrooms, and transformed the attic. Custom bookshelfs, stairs and timber structural posts are also part of this project. Plus a hidded bar!
View the complete Folsom Street Full House Remodel album
Bookshelf stairs



Structural wooden posts



Stair construction and finishing


Roof reinforcement and attic remodel





Finished upstairs interior and ceilings




Bathroom — finished details



Interior gut remodel and sheathing


Rear addition — structural and floor work



Dolores Street — Two-Story Rear Addition
Started at the beginning of the COVID-19 pandemic, following LED Construction’s Pierce Street facade restoration, this Dolores Street project added two stories at the rear of the home on a new foundation. The scope included two kitchens, three bathrooms, a pantry and new windows. The finishes were intentionally understated, with the client prioritizing heated floors in the addition and quality bathroom finishes, including imported marble.
Access shaped the entire build: all materials had to pass through a breezeway opening just 3½ feet wide by 7 feet high. Reinforcing steel and beams were brought through this opening, and concrete was pumped through the same restricted access.
View the complete Dolores Street album
Bathrooms and finished interiors






Foundation and addition construction



Lower Belvedere
Complete facade restoration of a Victorian home, with new plaster moldings, gold leaf, and wood moldings fabricated by LED Construction or sourced from Beronio. The project also includes inset cabinetry, a traditional dark wood staircase, fireplace restoration, and a circular flagstone fire pit.
With thanks to Lorna Kollmeyer Ornamental Plaster for the beautiful plaster pieces used in this restoration.
View the complete Lower Belvedere album
Green Victorian facade and entrance







Inset cabinetry and interior details





Dark wood staircase and handrails


Fireplace and interior restoration

Flagstone fire pit and outdoor framing




Upper Belvedere
LED Construction served as general contractor and project manager for a major structural rebuild and fourth-story addition, including new foundations, structural steel and finished interiors. Bandside Framers carried out the framing. The project was interrupted by the COVID-19 lockdowns. The completed home includes wood stairs with glass balustrades and a glass-railed roof deck.
View the complete Upper Belvedere album
Facade — before and after


Finished facade and roof deck


Kitchen


Wood stairs and glass balustrades



Framingthe 4th floor addition:


Foundation and lots of structural steel



Marin — Ground-Up Construction, 2005
Early ground-up construction experience from 2005, on an owner-builder project.
View the complete Marin ground-up album

Roanoke Street
LED Construction completed this San Francisco Victorian remodel in two phases. The lower-unit phase added a room, hallway, water closet and washroom, with a steel I-beam in the garage allowing a central support post to be removed. The facade phase involved a full facade tear-off and rebuild, window work, waterproofing and painting, with corbels, period-appropriate handrails, and interior and exterior trim.
View the Roanoke Street project album
Facade — before, concept and after



Facade details




Windows & interior trim
At the two large rear windows shown in the interior photos, LED Construction rebuilt and installed the window sashes themselves and reconstructed the extensively dry-rotted surrounding structure.


Exterior work & trim details


Sanchez Street — Facade Remodel
LED Construction completed a full facade remodel of this San Francisco Victorian, including painting, decorative block-pattern stamping in stucco with a painted finish, and new wrought-iron fencing to complement the home’s Victorian character.
View the Sanchez Street project album
Facade — before and after


Finished facade and details





Original facade details


Crestmont — Downstairs ADU Buildout
LED Construction transformed a downstairs garage in San Francisco into finished living space with a bathroom and shower. This ADU buildout also included an area prepared for a future kitchen.
View the Crestmont ADU project album
Garage to living space — before and after


Finished bathroom and interior details






Shower preparation and tile installation


Fairmont Street — First-Floor Remodel
LED Construction completed a full first-floor remodel of this San Francisco home, renovating the kitchen and bathroom and removing interior walls to open up the living room. The project also converted an existing room into a bedroom, added closets, and installed new hardwood flooring throughout. Structural improvements in the garage and basement included shear-wall work and hold-down bolts.
View the complete Fairmont Street project album
Kitchen
Bathroom

Living spaces, closets and hardwood floors


Church Street, Noe Valley — 2005
First owner-builder project, completed in 2005 as a freelance carpenter. Work included rebuilding the facade, a Victorian-style fence and an Ipe deck. The live-flame gas lantern received San Francisco Fire Department approval coordinated by the plumber.
View the Church Street, Noe Valley project album


Castro — Decorative Painting & Carpentry, 2005
Decorative exterior painting and selected carpentry on a Victorian home in the Castro, completed in 2005 as a freelance carpenter on an owner-builder project.



Goldmine — Cantilevered Room Retrofit & Rebuild
At Goldmine in San Francisco, rebuilding a cantilevered room meant working two stories above a hillside. With no practical way to set up scaffolding on the slope below, every stage of the structural retrofit and rebuild had to be accessed through the second story, from framing to roofing. Material handling, work sequencing and access were central to the job. The result is a bright, beautifully finished interior that gives little hint of the demanding work behind it.
View the Goldmine project album










Miscellaneous
View the Miscellaneous photo album



