Fairmont Street — First-Floor Remodel

LED Construction completed a full first-floor remodel of this San Francisco home, renovating the kitchen and bathroom and removing interior walls to open up the living room. The project also converted an existing room into a bedroom, added closets, and installed new hardwood flooring throughout. Structural improvements in the garage and basement included shear-wall work and hold-down bolts.

Back to the project gallery

Kitchen

Bathroom

Living spaces, closets and hardwood floors